Occoquan Reservoir
(Mobley Engineering 2012 -- under contract)

  • Fairfax Water Authority, Fairfax, VA
  • 39,700 acre-feet (49GL)
  • 1 diffuser line, 2,600 feet total
  • 54-scfm/day oxygen delivery capacity (3,000 kg/day)

 

Calero Reservoir
(Mobley Engineering 2011 -- under construction)

  • Santa Clara Valley Water District, San Jose, CA
  • 7,500 acre-feet (11GL)
  • 1 diffuser line, 1,000 feet total
  • 12-scfm/day oxygen delivery capacity (675 kg/day)

 

Lake Vadnais
(Mobley Engineering 2011)

  • Saint Paul Regional Water Services, Saint Paul, MN
  • 9,000 acre-feet (11GL)
  • 2 diffuser lines, 3,000 feet total
  • 120-scfm/day oxygen deliver capacity (5,500 kg/day)

 

Peace River Reservoir #2
(Mobley Engineering 2010)

  • Peace River Manasota Regional Water Authority, Port Charlotte, FL
  • 6 billion gallons (22GL)
  • 4 diffuser lines, 12,240 feet total
  • 750-scfm air delivery capacity

 
 

San Antonio Reservoir
(Mobley Engineering 2009)

  • San Francisco Public Utility Commission, San Francisco, CA
  • 55,000 acre-feet (68GL)
  • 2 diffuser lines, 3,780 feet total
  • 9-tons/day oxygen delivery capacity

 
 

Crystal Reservoir
(Mobley Engineering 2009)

  • Board of Public Utilities, Cheyenne, WY
  • 3,988 acre-feet (68GL)
  • 2 diffuser lines, 1,200 feet total
  • 7-ton/day oxygen delivery capacity

 

Calaveras Reservoir
(Mobley Engineering 2005)

  • San Francisco Public Utility Commission, San Fransicso, CA
  • 860 acres, 34,000 acre feet (42GL)
  • 2 diffuser lines, 2,000 feet total
  • 4-tons/day oxygen  delivery capacity

 




 

Peace River Reservoir #1
(Mobley Engineering 2008)

  • Peace River Manasota Regional Water Authority, Port Charlotte, FL
  • 625,000,000 gallons (2.3GL)
  • 2 diffuser lines, 3,630 feet total
  • 200-scfm air delivery capacity



Carvin Cove Reservoir
(Mobley Engineering 2005)

  • Western  Virginia Water Authority, Roanoke, VA
  • 2 diffuser lines, 4,000 feet total
  • 4 tons/day oxygen delivery

 

Upper San Leandro Reservoir
(Mobley Engineering 2001)

  • East Bay Municipal Utility District, Oakland, CA
  • 750 acres, 36,000 acre feet (44GL)
  • 2 diffuser lines, 4,800 feet total
  • 9 tons/day oxygen delivery capacity

 



 

Los Vaqueros Reservoir
(Mobley Engineering 2000)

  • Contra Costa Water District, Concord, CA
  • 2 diffuser lines, 8,000 feet total
  • 14 tons/day oxygen delivery capacity


 
 

Spring Hollow Reservoir
(TVA 1997, Mobley Engineering 2004)

  • County of Roanoke Utility District, Salem, VA
  • 1 diffuser, 3,500 feet total
  • 120 to 170-scfm air capacity
  • Modified to 1 diffuser, 2,000 feet total, utilizing oxygen (2004)
  • 1.2 tons/day average oxygen delivery capacity

 


Mobley Engineering, Inc. • PO Box 600 Norris, Tennessee 37828-0600
phone (865) 494-0600 • fax (865) 494-0611
Email: info@mobleyengineering.com

Copyright 2007, Mobley Engineering, Inc. All rights reserved.

Website powered by Network Solutions®

Home

About MEI

Projects

Hydropower

Water Supply

Fish Habitat

Natural Lakes

Other

TVA

Publications

Technologies

Hydropower Enhancements

Water Supply Enhancements

Video

Links

Upcoming Events

NALMS

HydroVision

News Worthy

Our Favorites