Mobley Engineering

Design and installation of aeration systems for hydropower, water supply reservoirs and other applications

Mobley Engineering
Upper San Leandro Reservoir - 2002





  • to control algae-related taste and odor problems
  • 4.4-tons/day oxygen capacity
  • 8,500 feet of line diffuser in one line
  • Located near Oakland, California





The work site on top of the dam at Upper San Leandro Reservoir
The supply line protected in PVC pipe
Supply line connection
Stored line diffuser
Loading weights
Hanging weights
Water pump for launch
The work crew
Deployment day
 
 
Checking for leaks
Line diffuser
Aligning the diffuser line
Sinking line diffuser
Bubble pattern
Close up of bubbles
 
 
More bubbles
The LOx facility below the dam
The LOx facility
The control valves
Control station
 
Control station
Mark Mobley
Susan Mobley
Surface bubbles at sunset

________________________________________________________________________________


For more information about this project click on the following document:

Upper San Leandro Hypolimnetic Oxygenation System

Mark H. Mobley, Rodney Jung, H. Hubert Lai


Mobley Engineering, Inc. • PO Box 600 Norris, Tennessee 37828-0600
phone (865) 494-0600 • fax (865) 494-0611
Email: info@mobleyengineering.com

Copyright 2007, Mobley Engineering, Inc. All rights reserved.

Website powered by Network Solutions®

Home

About MEI

Projects

Hydropower

Water Supply

Fish Habitat

Natural Lakes

Other

TVA

Publications

Technologies

Hydropower Enhancements

Water Supply Enhancements

Video

Links

Upcoming Events

NALMS

HydroVision

News Worthy

Our Favorites