| Mio Hydroelectric Plant (Mobley Engineering 2008)
- Consumers Energy, Mio, MI
- Two 25 foot diameter upwelling diffusers
- Supplied by portable air compressor
- Enhance turbine release temperatures for downstream fish habitat
|
|
| Croton Hydroelectric Plant (Mobley Engineering 2008)
- Consumers Energy, Newago, MI
- Two 25 foot diameter upwelling diffusers
- Supplied by portable air compressor
- Enhance turbine release temperatures for downstream fish habitat
|
|
| Hodenpyl Hydroelectric Plant (Mobley Engioneering 2007)
- Consumers Energy, Mesick, MI
- Two 15 foot diameter upwelling difussers
- Supplied by portable air compressor
- Enhance turbine release temperatures for downstream fish habitat
|
|
| Broken Bow Dam (Mobley Engineering 2007)
- Oklahoma Department of Wildlife Conservation, Broken Bow, OK
- Three 15 foot diameter upwelling diffusers
- Supplied by portable air compressors
- Experimental attempt at enhancing turbine release temperatures for downstream fish habitat
|
|